AI Todolist: Fix Gyoshu Premature SUCCESS Bug

Goal: Implement a Two-Gate System that prevents SUCCESS status when research goals are not met, even if evidence quality (Trust Gate) is high.

Problem Statement

Currently, Gyoshu can declare SUCCESS when:

  1. Trust Gate passes (Baksa verification >= 80)
  2. Quality Gates pass (statistical evidence present)

But there's NO check that the actual research goal is achieved. Example:

  • User: "Build a model with 90% accuracy"
  • Jogyo builds model with 75% accuracy (with perfect statistical evidence)
  • Baksa verifies evidence is solid -> Trust = 85
  • Result: SUCCESS (but goal was 90%!)

Solution: Two-Gate System

Trust Gate Goal Gate Result
PASS MET SUCCESS
PASS NOT_MET PARTIAL -> Pivot
PASS BLOCKED BLOCKED
FAIL MET PARTIAL -> Rework trust
FAIL NOT_MET PARTIAL
FAIL BLOCKED BLOCKED

Phase 0: Prompt Alignment (Quick Win)

Effort: 1-2 hours | Risk: Low | Impact: Medium Goal: Immediate behavioral improvement without code changes

Task 0.1: Update gyoshu.md - Require Goal Contract

  • File: src/agent/gyoshu.md
  • Location: After "Starting New Research" section (~line 503)
  • Changes:
    • Add "Goal Contract Creation" section requiring structured acceptance criteria
    • Add validation that Goal Contract exists before accepting SUCCESS
    • Add decision matrix showing Trust Gate + Goal Gate logic
  • Estimated Lines: +50-80 lines

Task 0.2: Update jogyo.md - Never Claim Unmet Goals

  • File: src/agent/jogyo.md
  • Location: "Completion Signaling" section (~line 999)
  • Changes:
    • Add explicit rule: "NEVER signal SUCCESS unless acceptance criteria demonstrably met"
    • Add requirement to check goal metrics before completion
    • Add Goal Evidence section showing how to reference acceptance criteria
  • Estimated Lines: +30-40 lines

Task 0.3: Update baksa.md - Add Goal Evidence Challenge

  • File: src/agent/baksa.md
  • Location: "Challenge Generation Protocol" section (~line 42)
  • Changes:
    • Add "Goal Achievement Challenges" section
    • Add challenge: "Does the evidence show acceptance criteria are met?"
    • Add trust score penalty for claiming SUCCESS without meeting goal metrics
  • Estimated Lines: +40-50 lines

Phase 1: Goal Contract Schema (Short)

Effort: 2-3 hours | Risk: Low | Impact: High Goal: Define structured acceptance criteria in notebook frontmatter

Task 1.1: Extend GyoshuFrontmatter Interface

  • File: src/lib/notebook-frontmatter.ts
  • Location: After GyoshuFrontmatter interface (~line 61)
  • Changes:
    /** Acceptance criteria kind */
    export type AcceptanceCriteriaKind = 
      | "metric_threshold"    // e.g., accuracy >= 0.90
      | "marker_required"     // e.g., [METRIC:baseline_accuracy] must exist
      | "artifact_exists"     // e.g., model.pkl must be created
      | "finding_count";      // e.g., at least 3 verified findings
    
    /** Single acceptance criterion */
    export interface AcceptanceCriterion {
      id: string;              // e.g., "AC1"
      kind: AcceptanceCriteriaKind;
      description?: string;    // Human-readable description
      // For metric_threshold
      metric?: string;         // e.g., "cv_accuracy_mean"
      op?: ">=" | ">" | "<=" | "<" | "==" | "!=";
      target?: number;
      // For marker_required
      marker?: string;         // e.g., "METRIC:baseline_accuracy"
      // For artifact_exists
      artifactPattern?: string; // e.g., "*.pkl"
      // For finding_count
      minCount?: number;
    }
    
    /** Goal contract for acceptance criteria */
    export interface GoalContract {
      version: number;         // Schema version (1)
      goal_text: string;       // Original user goal
      goal_type?: string;      // e.g., "ml_classification", "eda", "hypothesis_test"
      acceptance_criteria: AcceptanceCriterion[];
      max_goal_attempts?: number;  // Default: 3
    }
  • Then extend GyoshuFrontmatter:
    export interface GyoshuFrontmatter {
      // ... existing fields ...
      /** Goal contract for acceptance criteria evaluation */
      goal_contract?: GoalContract;
    }
  • Estimated Lines: +60-80 lines

Task 1.2: Update extractFrontmatter to Parse Goal Contract

  • File: src/lib/notebook-frontmatter.ts
  • Location: extractFrontmatter function (~line 474)
  • Changes:
    • Add parsing for goal_contract field from YAML
    • Handle nested acceptance_criteria array
    • Validate required fields per criterion kind
  • Estimated Lines: +30-40 lines

Task 1.3: Update serializeToYaml for Goal Contract

  • File: src/lib/notebook-frontmatter.ts
  • Location: serializeToYaml function (~line 290)
  • Changes:
    • Handle nested object serialization for goal_contract
    • Ensure acceptance_criteria array serializes correctly
  • Estimated Lines: +20-30 lines

Task 1.4: Add Goal Contract Validation

  • File: src/lib/notebook-frontmatter.ts
  • Location: After validateFrontmatter function (~line 700)
  • Changes:
    export function validateGoalContract(contract: GoalContract): { 
      isValid: boolean; 
      errors: string[] 
    }
    • Validate version is 1
    • Validate goal_text is non-empty
    • Validate each criterion has required fields for its kind
  • Estimated Lines: +40-50 lines

Task 1.5: Add Tests for Goal Contract Schema

  • File: src/lib/notebook-frontmatter.test.ts (new or extend existing)
  • Changes:
    • Test parsing valid goal contract
    • Test serialization roundtrip
    • Test validation errors for invalid contracts
    • Test backward compatibility (notebooks without goal_contract)
  • Estimated Lines: +100-150 lines

Phase 2: Goal Gate Evaluator Library (Short-Medium)

Effort: 4-6 hours | Risk: Medium | Impact: High Goal: Library that evaluates acceptance criteria against notebook outputs

Task 2.1: Create Goal Gates Library

  • File: src/lib/goal-gates.ts (NEW)
  • Changes:
    /**
     * Goal Gates Library - Evaluate acceptance criteria against research outputs.
     * 
     * Complements quality-gates.ts (Trust Gate) with Goal Gate evaluation.
     * Together they form the Two-Gate system for research completion.
     * 
     * @module goal-gates
     */
    
    import { GoalContract, AcceptanceCriterion } from "./notebook-frontmatter";
    import { parseMarkers, ParsedMarker } from "./marker-parser";
    
    export type CriterionStatus = "MET" | "NOT_MET" | "BLOCKED" | "UNKNOWN";
    
    export interface CriterionResult {
      criterion: AcceptanceCriterion;
      status: CriterionStatus;
      actualValue?: number | string | boolean;
      message: string;
    }
    
    export interface GoalGateResult {
      passed: boolean;           // All criteria MET
      overallStatus: "MET" | "NOT_MET" | "BLOCKED" | "NO_CONTRACT";
      criteriaResults: CriterionResult[];
      metCount: number;
      totalCount: number;
      blockers?: string[];       // For BLOCKED status
    }
    
    /**
     * Evaluate goal contract against notebook outputs.
     */
    export function evaluateGoalGate(
      contract: GoalContract | undefined,
      notebookOutput: string,
      artifacts: string[]
    ): GoalGateResult
  • Estimated Lines: 150-200 lines

Task 2.2: Implement Metric Threshold Evaluator

  • File: src/lib/goal-gates.ts
  • Changes:
    function evaluateMetricThreshold(
      criterion: AcceptanceCriterion,
      markers: ParsedMarker[]
    ): CriterionResult
    • Find [METRIC:{metric}] marker in outputs
    • Parse numeric value
    • Apply comparison operator
    • Return MET/NOT_MET with actual vs target
  • Estimated Lines: +40-50 lines

Task 2.3: Implement Marker Required Evaluator

  • File: src/lib/goal-gates.ts
  • Changes:
    function evaluateMarkerRequired(
      criterion: AcceptanceCriterion,
      markers: ParsedMarker[]
    ): CriterionResult
    • Check if specified marker type exists
    • Support wildcards (e.g., "METRIC:baseline_*")
  • Estimated Lines: +25-35 lines

Task 2.4: Implement Artifact Exists Evaluator

  • File: src/lib/goal-gates.ts
  • Changes:
    function evaluateArtifactExists(
      criterion: AcceptanceCriterion,
      artifacts: string[]
    ): CriterionResult
    • Match artifact patterns (glob-style)
    • Return MET if matching artifact found
  • Estimated Lines: +20-30 lines

Task 2.5: Implement Finding Count Evaluator

  • File: src/lib/goal-gates.ts
  • Changes:
    function evaluateFindingCount(
      criterion: AcceptanceCriterion,
      markers: ParsedMarker[],
      qualityGateResult: QualityGateResult
    ): CriterionResult
    • Count verified findings (from quality gates)
    • Compare against minCount
  • Estimated Lines: +20-25 lines

Task 2.6: Add Pivot Protocol Support

  • File: src/lib/goal-gates.ts
  • Changes:
    export interface PivotRecommendation {
      shouldPivot: boolean;
      attemptNumber: number;
      maxAttempts: number;
      suggestions: string[];
    }
    
    export function recommendPivot(
      result: GoalGateResult,
      attemptHistory: GoalGateResult[]
    ): PivotRecommendation
    • Track attempt count
    • Suggest different approaches after failures
    • Mark as "Unachievable" after 2+ distinct approaches fail
  • Estimated Lines: +40-50 lines

Task 2.7: Add Goal Gates Tests

  • File: src/lib/goal-gates.test.ts (NEW)
  • Changes:
    • Test metric threshold evaluation (>=, <, ==, etc.)
    • Test marker required evaluation
    • Test artifact exists evaluation
    • Test finding count evaluation
    • Test overall goal gate pass/fail logic
    • Test pivot recommendations
  • Estimated Lines: +200-250 lines

Phase 3: Enforce in Completion Tool (Short)

Effort: 3-4 hours | Risk: Medium | Impact: Critical Goal: Integrate Goal Gate into gyoshu-completion.ts

Task 3.1: Import and Load Goal Contract

  • File: src/tool/gyoshu-completion.ts
  • Location: After imports (~line 15)
  • Changes:
    • Import goal-gates.ts
    • Import notebook-frontmatter.ts for extractFrontmatter
    • Add function to load goal contract from notebook
  • Estimated Lines: +20-30 lines

Task 3.2: Evaluate Goal Gate Before Final Status

  • File: src/tool/gyoshu-completion.ts
  • Location: After quality gate evaluation (~line 361)
  • Changes:
    // Evaluate Goal Gate (in addition to Trust Gate)
    let goalGateResult: GoalGateResult | undefined;
    
    if (status === "SUCCESS" && reportTitle) {
      const notebookPath = getNotebookPath(reportTitle);
      const notebook = JSON.parse(await fs.readFile(notebookPath, "utf-8"));
      const frontmatter = extractFrontmatter(notebook);
      
      if (frontmatter?.goal_contract) {
        goalGateResult = evaluateGoalGate(
          frontmatter.goal_contract,
          allOutput.join("\n"),
          typedEvidence?.artifactPaths || []
        );
        
        // Apply Two-Gate Decision Matrix
        if (!goalGateResult.passed) {
          adjustedStatus = "PARTIAL";
          warnings.push({
            code: "GOAL_NOT_MET",
            message: `Goal criteria not met: ${goalGateResult.metCount}/${goalGateResult.totalCount} criteria passed`,
            severity: "warning"
          });
        }
      }
    }
  • Estimated Lines: +40-50 lines

Task 3.3: Update Response with Goal Gate Result

  • File: src/tool/gyoshu-completion.ts
  • Location: Response construction (~line 436)
  • Changes:
    • Add goalGates section to response
    • Include criteriaResults for transparency
    • Include pivot recommendations if applicable
  • Estimated Lines: +20-30 lines

Task 3.4: Track Goal Attempt Count

  • File: src/tool/gyoshu-completion.ts
  • Changes:
    • Store goal attempt count in session manifest
    • Increment on each PARTIAL due to goal failure
    • Trigger BLOCKED if max_goal_attempts exceeded
  • Estimated Lines: +30-40 lines

Task 3.5: Add Integration Tests

  • File: tests/goal-gates-integration.test.ts (NEW)
  • Changes:
    • Test SUCCESS with goal met
    • Test PARTIAL downgrade when goal not met
    • Test BLOCKED after max attempts
    • Test backward compatibility (no goal contract)
    • Test interaction with quality gates
  • Estimated Lines: +150-200 lines

Phase 4: Surface in Snapshots (Optional)

Effort: 1-2 hours | Risk: Low | Impact: Medium Goal: Make goal status visible in gyoshu_snapshot for planner

Task 4.1: Add Goal Status to Snapshot

  • File: src/tool/gyoshu-snapshot.ts
  • Changes:
    • Add goalContract summary to snapshot response
    • Add goalProgress showing met/total criteria
    • Add lastGoalAttempt tracking
  • Estimated Lines: +30-40 lines

Task 4.2: Update Snapshot Response Type

  • File: src/tool/gyoshu-snapshot.ts
  • Changes:
    interface SnapshotResponse {
      // ... existing fields ...
      goalContract?: {
        goal_text: string;
        criteriaCount: number;
        metCount: number;
        attemptNumber: number;
        maxAttempts: number;
      };
    }
  • Estimated Lines: +15-20 lines

Phase 5: Documentation Update

Effort: 1-2 hours | Risk: None | Impact: High Goal: Document the new Two-Gate system

Task 5.1: Update AGENTS.md

  • File: AGENTS.md
  • Location: After "Research Quality Standards" section
  • Changes:
    • Add "Goal Contract" section explaining the concept
    • Add "Two-Gate System" section with decision matrix
    • Add "Acceptance Criteria Types" reference table
    • Add examples of goal contracts for common research types
  • Estimated Lines: +100-150 lines

Task 5.2: Update README.md

  • File: README.md
  • Location: Features section
  • Changes:
    • Add bullet about Goal Gate preventing premature SUCCESS
    • Update "Research Quality" section if exists
  • Estimated Lines: +10-20 lines

Implementation Order (Recommended)

Phase 0 (Immediate) ─────────────────────────────────────┐
  Task 0.1: gyoshu.md (Goal Contract requirement)        │
  Task 0.2: jogyo.md (Never claim unmet goals)           │ Can deploy immediately
  Task 0.3: baksa.md (Goal evidence challenges)          │ for behavioral improvement
─────────────────────────────────────────────────────────┘

Phase 1 (Foundation) ────────────────────────────────────┐
  Task 1.1: GyoshuFrontmatter interface                  │
  Task 1.2: extractFrontmatter parsing                   │ Schema must be stable
  Task 1.3: serializeToYaml update                       │ before library work
  Task 1.4: validateGoalContract                         │
  Task 1.5: Schema tests                                 │
─────────────────────────────────────────────────────────┘
                           │
                           ▼
Phase 2 (Library) ───────────────────────────────────────┐
  Task 2.1: goal-gates.ts skeleton                       │
  Task 2.2: Metric threshold evaluator                   │ Parallel development
  Task 2.3: Marker required evaluator                    │ possible for evaluators
  Task 2.4: Artifact exists evaluator                    │
  Task 2.5: Finding count evaluator                      │
  Task 2.6: Pivot protocol                               │
  Task 2.7: Library tests                                │
─────────────────────────────────────────────────────────┘
                           │
                           ▼
Phase 3 (Integration) ───────────────────────────────────┐
  Task 3.1: Import/load goal contract                    │
  Task 3.2: Evaluate goal gate                           │ Critical path -
  Task 3.3: Update response                              │ enforce the gates
  Task 3.4: Track attempt count                          │
  Task 3.5: Integration tests                            │
─────────────────────────────────────────────────────────┘
                           │
                           ▼
Phase 4 (Optional) ──────────────────────────────────────┐
  Task 4.1: Snapshot goal status                         │ Nice to have for
  Task 4.2: Snapshot response type                       │ planner visibility
─────────────────────────────────────────────────────────┘
                           │
                           ▼
Phase 5 (Documentation) ─────────────────────────────────┐
  Task 5.1: AGENTS.md update                             │
  Task 5.2: README.md update                             │
─────────────────────────────────────────────────────────┘

Effort Summary

Phase Tasks Estimated Hours Risk
Phase 0 3 1-2 hours Low
Phase 1 5 2-3 hours Low
Phase 2 7 4-6 hours Medium
Phase 3 5 3-4 hours Medium
Phase 4 2 1-2 hours Low
Phase 5 2 1-2 hours None
Total 24 12-19 hours -

Success Criteria

After implementation:

  1. Goal Contract Required: Creating research with clear goals automatically generates acceptance criteria
  2. Goal Gate Enforced: SUCCESS status only possible when:
    • Trust Gate passes (Baksa verification >= 80)
    • Quality Gates pass (statistical evidence present)
    • Goal Gate passes (acceptance criteria met) <- NEW
  3. Pivot on Failure: When goal not met but evidence is solid:
    • Status becomes PARTIAL
    • Pivot recommendations provided
    • Max 3 attempts before BLOCKED
  4. Backward Compatible: Existing notebooks without goal_contract still work (goal gate skipped)
  5. Transparent: Goal gate results visible in completion response and snapshots

Test Scenarios

Scenario A: Goal Met + Trust High

goal_contract:
  goal_text: "Build model with >= 80% accuracy"
  acceptance_criteria:
    - id: AC1
      kind: metric_threshold
      metric: cv_accuracy_mean
      op: ">="
      target: 0.80
  • Model achieves 85% accuracy
  • Trust score: 90
  • Expected: SUCCESS

Scenario B: Goal Not Met + Trust High

goal_contract:
  goal_text: "Build model with >= 90% accuracy"
  acceptance_criteria:
    - id: AC1
      kind: metric_threshold
      metric: cv_accuracy_mean
      op: ">="
      target: 0.90
  • Model achieves 75% accuracy (with perfect evidence)
  • Trust score: 85
  • Expected: PARTIAL (downgraded from SUCCESS)
  • Message: "Goal criteria not met: 0/1 criteria passed"

Scenario C: No Goal Contract (Backward Compat)

  • Research created before goal_contract feature
  • Trust score: 82
  • Quality gates pass
  • Expected: SUCCESS (goal gate skipped)

Scenario D: Multiple Criteria, Partial Met

goal_contract:
  goal_text: "Analyze customer churn with statistical evidence"
  acceptance_criteria:
    - id: AC1
      kind: metric_threshold
      metric: cv_accuracy_mean
      op: ">="
      target: 0.75
    - id: AC2
      kind: marker_required
      marker: "METRIC:baseline_accuracy"
    - id: AC3
      kind: finding_count
      minCount: 2
  • Accuracy: 78% (MET)
  • Baseline present (MET)
  • Only 1 verified finding (NOT_MET)
  • Expected: PARTIAL
  • Message: "Goal criteria not met: 2/3 criteria passed"

Risks and Mitigations

Risk Mitigation
Breaking existing research Backward compatibility: goal_contract is optional
Over-strict criteria blocking research max_goal_attempts allows pivoting before BLOCKED
Complex criterion types needed Start with 4 types, extensible interface for future
Performance impact on completion Goal gate runs once at completion, minimal overhead
User confusion about two gates Clear documentation and error messages

Open Questions

  1. Auto-generate criteria? Should Gyoshu auto-generate acceptance criteria from goal text?

    • Pro: Less burden on user/planner
    • Con: May generate incorrect criteria
    • Recommendation: Start with manual, add auto-gen in future phase
  2. Criterion weights? Should some criteria be more important than others?

    • Pro: Allows partial success for "nice to have" vs "must have"
    • Con: Adds complexity
    • Recommendation: Start simple (all or nothing), add weights later if needed
  3. Goal type inference? Should goal_type affect which criteria kinds are relevant?

    • Pro: Better defaults per research type
    • Con: More complexity
    • Recommendation: Keep goal_type as metadata only, not logic driver