Updated golang to 1.25.0 #4
pr.yaml
on: pull_request
Run Tests
35s
Matrix: integration-test
Annotations
5 errors
|
Integration Test (720p)
Process completed with exit code 1.
|
|
Integration Test (2k)
Process completed with exit code 1.
|
|
Integration Test (2k)
The strategy configuration was canceled because "integration-test._720p" failed
|
|
Integration Test (1080p)
Process completed with exit code 1.
|
|
Integration Test (1080p)
The strategy configuration was canceled because "integration-test._720p" failed
|