Updated golang to 1.25.0 #6
Annotations
5 errors and 1 warning
|
Integration Test (1080p)
Process completed with exit code 1.
|
|
Integration Test (720p)
Process completed with exit code 1.
|
|
Integration Test (720p)
The strategy configuration was canceled because "integration-test._1080p" failed
|
|
Integration Test (2k)
The operation was canceled.
|
|
Integration Test (2k)
The strategy configuration was canceled because "integration-test._1080p" failed
|
|
Run Tests
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
docker-image-16930804715
Expired
|
707 MB |
sha256:0bcc538e90555835d998b4157df102cea24b36cac2e1c2c7bbe5ff7fdba21d80
|
|