Skip to content

Updated golang to 1.25.0 #8

Updated golang to 1.25.0

Updated golang to 1.25.0 #8

Re-run triggered August 13, 2025 08:01
Status Failure
Total duration 3m 32s
Artifacts 1

pr.yaml

on: pull_request
Run Tests
15s
Run Tests
Build Docker Image
1m 7s
Build Docker Image
Matrix: integration-test
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
Integration Test (1080p)
Process completed with exit code 1.
Integration Test (2k)
Process completed with exit code 1.
Integration Test (2k)
The strategy configuration was canceled because "integration-test._1080p" failed
Integration Test (720p)
Process completed with exit code 1.
Integration Test (720p)
The strategy configuration was canceled because "integration-test._1080p" failed
Run Tests
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2

Artifacts

Produced during runtime
Name Size Digest
docker-image-16931231988 Expired
707 MB
sha256:21f6895b22d65b35cda167476459cfd95ce97b0f5a1af2a863cf485b33b2d2e5