Refactor background process metrics to be homeserver-scoped (#18670) #6690
tests.yml
on: push
changes
4s
check-sampleconfig
1m 15s
check-schema-delta
10s
lint
44s
Typechecking
2m 8s
lint-pydantic
1m 21s
lint-clippy
23s
lint-clippy-nightly
23s
lint-rust
1m 21s
lint-rustfmt
19s
lint-readme
14s
Matrix: portdb
Matrix: complement
trial-olddeps
9m 28s
cargo-test
739454d 18h
cargo-bench
739454d 18h
Matrix: trial-pypy
tests-done
2s
Annotations
14 errors and 2 warnings
|
trial (3.13, sqlite, all)
Process completed with exit code 1.
|
|
trial (3.11, sqlite, all)
The strategy configuration was canceled because "trial._3_13_sqlite_all" failed
|
|
trial (3.9, postgres, 13, all)
The operation was canceled.
|
|
trial (3.9, postgres, 13, all)
The strategy configuration was canceled because "trial._3_13_sqlite_all" failed
|
|
trial (3.13, postgres, 17, all)
The operation was canceled.
|
|
trial (3.13, postgres, 17, all)
The strategy configuration was canceled because "trial._3_13_sqlite_all" failed
|
|
trial (3.9, sqlite)
The operation was canceled.
|
|
trial (3.9, sqlite)
The strategy configuration was canceled because "trial._3_13_sqlite_all" failed
|
|
trial (3.10, sqlite, all)
The operation was canceled.
|
|
trial (3.10, sqlite, all)
The strategy configuration was canceled because "trial._3_13_sqlite_all" failed
|
|
trial (3.9, sqlite, all)
The operation was canceled.
|
|
trial (3.9, sqlite, all)
The strategy configuration was canceled because "trial._3_13_sqlite_all" failed
|
|
complement (workers, Postgres)
Process completed with exit code 1.
|
|
tests-done
Job trial returned failure
|
|
complement (monolith, SQLite)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
|
complement (workers, Postgres)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|