Operator Wiring Kickoff — Day-1 Walkthrough

Audience: the on-call operator bringing each integration live for the first time. This is a checklist, not an engineering spec. If a step asks you to decide architecture, stop and escalate — the runbook owns the decisions, you own the execution.

Integrations in scope: Datadog, Sentry, PagerDuty, Opsgenie, Slack, Splunk.

All shipped artifacts live under packages/safety/operator-wiring-2026-05/:

  • setup-runbooks/<integration>.md — one runbook per integration (cred fields, env vars, post-setup smoke test)
  • verify/verify-all.sh — single-entry verifier, returns non-zero on any failure
  • verify/<integration>.sh — per-integration probe (called by verify-all.sh)
  • mock-endpoints/ — local stand-ins (docker-compose) you hit before real SaaS creds

Estimated total Day-1 wall time: 4–6 hours if no SaaS access blockers, 1–2 days if creds need procurement.


1. Day-1 master checklist

Run these in order. Do not skip ahead — step N's verify is step N+1's precondition.

Cold start (steps 1–6)

  1. Clone the repo at the tag named in MACRO_ROADMAP.md § Operator-wiring. Verify packages/safety/operator-wiring-2026-05/ is present.
  2. Copy operator-wiring-2026-05/.env.example to .env.local. Do NOT commit this file.
  3. Install prereqs: Docker Desktop running, jq, curl, bash (Git Bash on Windows is fine).
  4. From operator-wiring-2026-05/mock-endpoints/, run docker compose up -d. Confirm all six mock services reach healthy status (docker compose ps).
  5. Export the mock-mode flag: export OPERATOR_WIRING_MODE=mock.
  6. Run ./verify/verify-all.sh. Expect all six integrations PASS against the mocks. If any FAIL here, fix Docker/network before touching real creds.

Credential acquisition (steps 7–12)

See § 2 below for per-integration cred steps. Work them in this order — easiest first builds momentum:

  1. Slack — webhook URL (10 min)
  2. Sentry — DSN (15 min)
  3. PagerDuty — service integration key (20 min)
  4. Opsgenie — API key + team (20 min)
  5. Datadog — API + APP key, confirm DD_SITE (30 min)
  6. Splunk — HEC token + endpoint (45 min, often gated by InfoSec)

Paste each into .env.local under the variable named at the top of the matching setup-runbooks/<integration>.md.

Single-integration verify (steps 13–18)

After each cred lands, switch that integration to real mode and verify:

  1. export OPERATOR_WIRING_MODE=real_slack./verify/slack.sh → expect a real test message in the configured channel.
  2. export OPERATOR_WIRING_MODE=real_sentry./verify/sentry.sh → expect a synthetic error event in the Sentry project's issue list within 60s.
  3. export OPERATOR_WIRING_MODE=real_pagerduty./verify/pagerduty.sh → expect a test incident in the service, then auto-resolve.
  4. export OPERATOR_WIRING_MODE=real_opsgenie./verify/opsgenie.sh → expect a test alert on the configured team, then close.
  5. export OPERATOR_WIRING_MODE=real_datadog./verify/datadog.sh → expect a test metric (operator_wiring.verify=1) and a test event in Events Explorer.
  6. export OPERATOR_WIRING_MODE=real_splunk./verify/splunk.sh → expect a test event in the configured HEC index.

All-green and handoff (steps 19–24)

  1. export OPERATOR_WIRING_MODE=real_all./verify/verify-all.sh → all six PASS.
  2. Capture the verify-all.sh output to operator-wiring-2026-05/state/verify-day1-<YYYYMMDD>.log. Commit the log (not .env.local).
  3. Confirm each integration's notification reached its target human (Slack message visible, PagerDuty incident acknowledged, etc.). Operator-visible ≠ delivered.
  4. File the Day-1 completion record per MACRO_ROADMAP.md instructions (the brief notice, not a full status report).
  5. Stop the mock-endpoints stack: from mock-endpoints/, docker compose down. The mocks are dev aids, not load-bearing in real mode.
  6. Hand off .env.local location and the verify log to the dev team lead.

Resilience checks (steps 25–30)

  1. Disable network for 30s, run ./verify/datadog.sh. Expect a clean retry-then-fail (not a hang). Document timeout actually observed.
  2. Re-enable network. Re-run; expect PASS.
  3. Rotate the Slack webhook URL by adding a second one in Slack, swap into .env.local, re-run verify/slack.sh. Confirms rotation works without redeploy.
  4. Force-trigger one alert path end-to-end (Sentry error → PagerDuty incident → Slack message). Confirms the chain, not just each link.
  5. Open verify/verify-all.sh and read it once — you will run it as a cron later (§ 7).
  6. Note any deviation from this checklist in state/operator-deviations.md for the next operator's benefit.

2. Credential acquisition matrix

Integration Where to get it Env var(s) Time Gotcha
Datadog Org Settings → API Keys (create new) and Application Keys (create new). DD_SITE depends on your tenant: datadoghq.com (US1), datadoghq.eu (EU1), us3.datadoghq.com, us5.datadoghq.com, ap1.datadoghq.com. DD_API_KEY, DD_APP_KEY, DD_SITE 30 min Wrong DD_SITE returns silent 403; always check the URL of your dashboard.
Sentry Project → Settings → Client Keys (DSN). Pick the right project; new project takes 2 min. SENTRY_DSN 15 min EU tenants have *.ingest.de.sentry.io. Using a US DSN against an EU org fails with 401.
PagerDuty Service → Integrations → Add integration → Events API v2. Copy the Integration Key (32-char hex), NOT the API token. PAGERDUTY_ROUTING_KEY 20 min Use Events API v2 (/v2/enqueue), not the legacy Generic Events API.
Opsgenie Teams → → Integrations → API → API Key. Note region: api.opsgenie.com (US) vs api.eu.opsgenie.com (EU). OPSGENIE_API_KEY, OPSGENIE_REGION 20 min Account-level keys exist but the runbook uses team-scoped keys.
Slack App Directory → Incoming Webhooks → Add to channel. Copy the webhook URL. SLACK_WEBHOOK_URL 10 min Webhooks scoped to a single channel; one URL per channel you write to.
Splunk Settings → Data Inputs → HTTP Event Collector → New Token. Copy token + note the HEC URL (often https://<host>:8088/services/collector). SPLUNK_HEC_TOKEN, SPLUNK_HEC_URL 45 min InfoSec often gates HEC; allow a buffer for ticket time. Self-signed certs may force SPLUNK_HEC_INSECURE=1 in dev only.

Anything procurement-blocked: log it in state/cred-blockers.md with the ticket number. Do not stall Day-1 on one integration — finish the others and circle back.


3. Verification sequence

Always: mock first, real second. Two reasons:

  • Mock failures isolate to the local environment (Docker, network, scripts). Real-cred failures conflate environment, creds, and SaaS-side state.
  • Mock endpoints accept any token. If the mock fails, fixing real creds will not unblock you.

Mock pass criteria

./verify/verify-all.sh in OPERATOR_WIRING_MODE=mock:

  • All six integrations: PASS in the summary table.
  • Exit code 0.
  • Each per-integration script prints exactly one line per probe (request sent, response received).

Real pass criteria

Per-integration ./verify/<integration>.sh in its real_<name> mode:

  • HTTP 2xx from the SaaS endpoint.
  • Human-observable side effect (message in channel, incident in service, event in index).
  • Cleanup step succeeded (test incident auto-resolved, test alert closed, test event tagged verify=true).

If 2xx returns but the human-observable side effect doesn't appear: that's a routing issue (wrong channel, wrong service), not a creds issue. Re-check the runbook's "post-setup wiring" section.


4. Common failure modes

Symptom Diagnosis Fix
curl: (6) Could not resolve host for any SaaS endpoint Corporate DNS blocks the SaaS domain Request InfoSec allowlist; in the interim, use the mock-endpoints stack and document the block.
Datadog probe returns 403 with no body Wrong DD_SITE for your tenant Open your DD dashboard, read the URL, set DD_SITE to match. US1 uses bare datadoghq.com; everything else uses a region prefix.
Sentry probe returns 401 against a valid-looking DSN US-vs-EU region mismatch Confirm DSN host: *.ingest.us.sentry.io vs *.ingest.de.sentry.io. Re-issue from the correct org.
PagerDuty probe returns 202 but no incident appears Integration key bound to a different service, or service paused Open the service → Integrations tab → confirm the key matches the one in .env.local. Unpause if paused.
Opsgenie probe returns 422 "team not found" Team name typo or team scoped to a different region Re-check team name verbatim; verify OPSGENIE_REGION matches the team's region.
Slack webhook returns 404 Webhook revoked (app uninstalled, channel deleted, URL rotated) Re-issue the webhook in Slack. Webhooks expire silently when the parent app is uninstalled.
Splunk HEC returns 403 "token disabled" Token disabled or index ACL rejected the source Re-enable token; confirm the token's allowed indexes include your target.
First burst of events rate-limited SaaS first-write throttle (Datadog, Sentry both do this on cold accounts) Backoff per the runbook's retry table; wait 60s, retry once. If sustained, file a SaaS-side ticket.
Verify passes but no human sees the alert Notification routing not configured Each runbook has a "post-setup wiring" section — escalation policies, channel routes, on-call rotations. Verify checks delivery to SaaS; routing-to-human is separate.

If a failure mode isn't in this table, add it to state/operator-deviations.md. The next operator should not rediscover it.


5. Production rollout cadence

Day Stage Action
Day 1 dev + staging Complete steps 1–30 above. Both environments green on verify-all.sh.
Day 7 prod canary Enable for 1% of production traffic. Watch the six integrations' dashboards for 24h. Roll back if any integration silently drops events.
Day 14 full prod rollout Enable for 100% of production traffic. Run verify-all.sh daily for the first week.
Day 30 first month-end audit Reconcile event counts: what the app emitted vs what each SaaS received. Discrepancies > 1% are investigated.

Rollback path at each stage: revert the feature flag (OPERATOR_WIRING_PROD_ENABLED=0), keep creds in place. Do not delete creds during rollback — rollback should be a one-flag operation, not a multi-step teardown.


6. Day-of-rollout incident response

If verify-all.sh fails post-go-live or an integration silently stops delivering:

  1. Do not delete creds. Even broken creds are evidence.
  2. Preserve logs. Snapshot the last 1h of integration logs to state/incidents/<YYYYMMDD-HHMM>/. Include the failing verify-all.sh output verbatim.
  3. Roll back the flag. OPERATOR_WIRING_PROD_ENABLED=0 if a feature flag controls the path; otherwise revert to the prior release tag.
  4. Escalate. Page the integration owner per the on-call rotation in setup-runbooks/<integration>.md § Owner. If multiple integrations fail simultaneously, that's a substrate issue (network, DNS, proxy) — escalate to platform on-call, not per integration.
  5. Communicate. One-line update to the operations channel: integration, observed symptom, action taken, ETA. Don't speculate on root cause until logs are read.
  6. After recovery. Append a post-mortem entry to state/incidents/<id>/post-mortem.md. Update § 4 of this doc with the failure mode if it's novel.

Rollback is the default. Investigation happens after the flag is flipped, never instead of flipping it.


7. Ongoing maintenance

Cadence Task
Daily (first 14 days post-rollout) verify-all.sh runs on cron. Failures page the operator.
Weekly (steady state) verify-all.sh on cron. Failures open a low-priority ticket.
Monthly Reconcile event-count drift between app and each SaaS. Document drift > 1%.
Quarterly Rotate every credential. Keep the old cred active for 24h overlap, swap .env.local, re-verify, then revoke the old cred at the SaaS side.
Quarterly Dependabot review on the OTLP collector and any SaaS SDK pinned in operator-wiring-2026-05/. Bump minor versions; pin major versions until a manual review.
As-needed When a SaaS changes API endpoints (Datadog has done this; PagerDuty deprecated v1 events), update the runbook and bump the verify script.

Drift detection: verify-all.sh on cron is the cheapest cross-session sanity check the system has. Treat its failures as first-class incidents, not noise.


Closing note

If you finish Day-1 and any integration is yellow or unverified, do not declare done. The honest-numbers contract here: green means green, and partial-green is HOLD. The next operator inherits exactly what this one leaves behind — leave it in a state you'd want to inherit.