Skip to content

Fix CI so that it runs on push and PR for main branch #930

Fix CI so that it runs on push and PR for main branch

Fix CI so that it runs on push and PR for main branch #930

Triggered via pull request February 26, 2026 18:51
Status Failure
Total duration 1m 37s
Artifacts

ruby.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

14 errors
Test 3.0
Process completed with exit code 1.
Test head
The strategy configuration was canceled because "test._3_0" failed
Test head
The operation was canceled.
Profile
Process completed with exit code 1.
Test 3.3
The strategy configuration was canceled because "test._3_0" failed
Test 3.3
The operation was canceled.
Test 3.4
The strategy configuration was canceled because "test._3_0" failed
Test 3.4
The operation was canceled.
Test 3.1
The strategy configuration was canceled because "test._3_0" failed
Test 3.1
The operation was canceled.
Test 3.2
The strategy configuration was canceled because "test._3_0" failed
Test 3.2
The operation was canceled.
Test 4.0
The strategy configuration was canceled because "test._3_0" failed
Test 4.0
The operation was canceled.