Skip to content

Merge pull request #309 from x-izumin/chore/proxy #212

Merge pull request #309 from x-izumin/chore/proxy

Merge pull request #309 from x-izumin/chore/proxy #212

Triggered via push June 16, 2025 02:05
Status Failure
Total duration 42s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

12 errors
test (1.13.x, test-e2e)
Process completed with exit code 2.
test (1.13.x, test-e2e)
test-e2e] Error 1
test (1.13.x, test)
The operation was canceled.
test (1.13.x, test)
The strategy configuration was canceled because "test._1_13_x_test-e2e" failed
test (1.11.x, test-e2e)
The operation was canceled.
test (1.11.x, test-e2e)
The strategy configuration was canceled because "test._1_13_x_test-e2e" failed
test (1.12.x, test)
The operation was canceled.
test (1.12.x, test)
The strategy configuration was canceled because "test._1_13_x_test-e2e" failed
test (1.12.x, test-e2e)
The operation was canceled.
test (1.12.x, test-e2e)
The strategy configuration was canceled because "test._1_13_x_test-e2e" failed
test (1.11.x, test)
The operation was canceled.
test (1.11.x, test)
The strategy configuration was canceled because "test._1_13_x_test-e2e" failed