Skip to content

Finalize copies for the task list.#22993

Merged
vraja-pro merged 8 commits intofeature/task-list-phase-2from
1027-task-list-update-copies
Feb 18, 2026
Merged

Finalize copies for the task list.#22993
vraja-pro merged 8 commits intofeature/task-list-phase-2from
1027-task-list-update-copies

Conversation

@leonidasmi
Copy link
Copy Markdown
Contributor

@leonidasmi leonidasmi commented Feb 16, 2026

Context

Summary

This PR can be summarized in the following changelog entry:

  • Finalizes copies for the task list.

Relevant technical choices:

Test instructions

Test instructions for the acceptance test before the PR gets merged

This PR can be acceptance tested by following these steps:

  • Confirm that all the copies in all the tasks (both old and new, for Free tasks) are the same with the sheet.

Relevant test scenarios

  • Changes should be tested with the browser console open
  • Changes should be tested on different posts/pages/taxonomies/custom post types/custom taxonomies
  • Changes should be tested on different editors (Default Block/Gutenberg/Classic/Elementor/other)
  • Changes should be tested on different browsers
  • Changes should be tested on multisite

Test instructions for QA when the code is in the RC

  • QA should use the same steps as above.

QA can test this PR by following these steps:

Impact check

This PR affects the following parts of the plugin, which may require extra testing:

Other environments

  • This PR also affects Shopify. I have added a changelog entry starting with [shopify-seo], added test instructions for Shopify and attached the Shopify label to this PR.
  • This PR also affects Yoast SEO for Google Docs. I have added a changelog entry starting with [yoast-doc-extension], added test instructions for Yoast SEO for Google Docs and attached the Google Docs Add-on label to this PR.

Documentation

  • I have written documentation for this change. For example, comments in the Relevant technical choices, comments in the code, documentation on Confluence / shared Google Drive / Yoast developer portal, or other.

Quality assurance

  • I have tested this code to the best of my abilities.
  • During testing, I had activated all plugins that Yoast SEO provides integrations for.
  • I have added unit tests to verify the code works as intended.
  • If any part of the code is behind a feature flag, my test instructions also cover cases where the feature flag is switched off.
  • I have written this PR in accordance with my team's definition of done.
  • I have checked that the base branch is correctly set.
  • I have run grunt build:images and commited the results, if my PR introduces new images or SVGs.

Innovation

  • No innovation project is applicable for this PR.
  • This PR falls under an innovation project. I have attached the innovation label.
  • I have added my hours to the WBSO document.

Fixes #

@leonidasmi leonidasmi added the changelog: non-user-facing Needs to be included in the 'Non-userfacing' category in the changelog label Feb 16, 2026
@leonidasmi leonidasmi marked this pull request as ready for review February 16, 2026 13:32
@leonidasmi leonidasmi force-pushed the 1027-task-list-update-copies branch from 80d34ae to ed16098 Compare February 17, 2026 07:26
@leonidasmi leonidasmi added this to the feature/task-list milestone Feb 17, 2026
@github-actions
Copy link
Copy Markdown

A merge conflict has been detected for the proposed code changes in this PR. Please resolve the conflict by either rebasing the PR or merging in changes from the base branch.

Base automatically changed from 1063-task-list-deal-with-the-remaining-todos-of-phase-2 to feature/task-list-phase-2 February 17, 2026 11:34
@leonidasmi leonidasmi mentioned this pull request Feb 18, 2026
19 tasks
Copy link
Copy Markdown
Contributor

@vraja-pro vraja-pro left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

For :

  • Complete the first time configuration we use Complete the First-time configuration, should we remove the capitalization and dash? it's not in the table given in the test instructions
  • And another comment for extra space.

Comment thread src/task-list/application/tasks/improve-content-readability.php Outdated
@coveralls
Copy link
Copy Markdown

coveralls commented Feb 18, 2026

Pull Request Test Coverage Report for Build 5673320521349a36ce20d6657a126b468b0f48eb

Warning: This coverage report may be inaccurate.

This pull request's base commit is no longer the HEAD commit of its target branch. This means it includes changes from outside the original pull request, including, potentially, unrelated coverage changes.

Details

  • 22 of 22 (100.0%) changed or added relevant lines in 7 files are covered.
  • No unchanged relevant lines lost coverage.
  • Overall coverage increased (+0.002%) to 53.063%

Totals Coverage Status
Change from base Build 40a2f49a59a5b791028ef8b2cbaee11675d8005a: 0.002%
Covered Lines: 32697
Relevant Lines: 61649

💛 - Coveralls

Copy link
Copy Markdown
Contributor

@vraja-pro vraja-pro left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

CR & AC ✅

@vraja-pro vraja-pro merged commit 03ccda9 into feature/task-list-phase-2 Feb 18, 2026
25 checks passed
@vraja-pro vraja-pro deleted the 1027-task-list-update-copies branch February 18, 2026 14:43
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

changelog: non-user-facing Needs to be included in the 'Non-userfacing' category in the changelog

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants