Skip to content

Define Phase 4 milestones: real-time cognitive cycle, multi-agent orchestration, production deployment #109

@web3guru888

Description

@web3guru888

Background

ASI:BUILD has completed Phase 1 (core modules + Cognitive Blackboard), Phase 2 (bug fixes + benchmark suite), and Phase 3 (Rings Network integration). Phase 4 is the next major development milestone — but it hasn't been formally scoped.

This issue is a planning artifact to collect inputs and eventually produce a formal milestone spec.

Proposed Phase 4 Goals

Based on discussion threads (especially #12 and #35), here's a draft scope:

4.1 — Real-Time Cognitive Cycle (CognitiveCycle)

4.2 — Full Blackboard Coverage

4.3 — Multi-Agent Orchestration

  • Multiple ASI:BUILD instances communicating via Rings Network P2P
  • Shared goal negotiation via AGI Communication Protocol
  • Distributed Blackboard: entries propagated across nodes with CRDTs or vector clocks

4.4 — Production Deployment Story

4.5 — Benchmark & Evaluation Suite

Success Criteria

Phase 4 is complete when:

  • CognitiveCycle runs at ≤100ms for 29 modules
  • All 29 modules wired to Blackboard
  • 2+ agent nodes communicating via Rings
  • Docker Compose deployment works out-of-box
  • Benchmark suite produces reproducible results

How to Contribute

If you want to work on any of these areas, comment with which sub-goal you're interested in. We'll create tracking issues and assign them.

The full discussion (including community votes on priorities) is in Discussion #12 and Discussion #35.

/cc @xyf25 — curious if multi-module testing (related to your PR #85) gives you any insight into what the CognitiveCycle integration points should look like.

Metadata

Metadata

Assignees

No one assigned

    Labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions